Melonpool
Well-Known Member
- Joined
- Apr 24, 2002
- Messages
- 542
- Reaction score
- 30
I've been toying with the idea of making a new puppet movie (Those of you unfamiliar with my old puppet movie, click here).
Anyway, unlike my previous endeavor, I'd like to build a puppet-friendly elevated set. I've seen in various documentaries stage hands on puppet shoots easily removing and replacing flooring, leaving a sturdy, yet seamless floor to work from.
Does anyone have any tips/plans on a good system for this type of flooring? I'm still pretty far away from ever producing this thing, but my mind's starting to wander down this path.
Steve
Anyway, unlike my previous endeavor, I'd like to build a puppet-friendly elevated set. I've seen in various documentaries stage hands on puppet shoots easily removing and replacing flooring, leaving a sturdy, yet seamless floor to work from.
Does anyone have any tips/plans on a good system for this type of flooring? I'm still pretty far away from ever producing this thing, but my mind's starting to wander down this path.
Steve